Coatings Plant - JOTUN POWDER COATINGS (CZ) a. s. Trmice

Project: Jotun Powder Coatings Plant - Trmice Ústí nad Labem, CR
Client: Jotun Powder Coatings - Norway / Jotun Powder Coatings (CZ) a.s.
General consultant: INTECON, spol. s r. o.

Project work: 12/1998 - 12/2003 (I.-IV. phase)
Construction: 02/1999 - 08/2004 (I.-IV.phase)
Investments: 370/150 mil. CZK (I.-IV. phase)(total/civil)

Technological part

In the 1st phase (1993) two production lines with capacity of 1500 t/year were installed. In the 2nd phase (1999) the total capacity was increased up to 3000 t/year by installing the 3rd line. In the 3rd phase Intecon worked out project for installation of the 4th line to increase production capacity up to 5000 t/year in the year 2001. In the 4th phase (2003) INTECON worked out project for installation of the 5th and 6th line to increase production capacity up to 8000 t/year in the year 2004. Transformer house 35/0,4 kV, high and low voltage switch room, compressor house, cooling water unit, dust removal equipment, waste water treatments for sewage and technological waters were also included in the project.

Civil part

Construction of the new plant including main production hall and annexed administrative building, and further more, the waste water treatment, roads, laybyes, engineering networks, energy supplies, outside pipe and cable racks. The elaboration of Basic Design documentation for the territory and construction proceedings, detail design documentation, site supervision, and engineering services during the construction were provided for the client.