Distribution Storage of Liquid and Solid Chemicals - BRENNTAG QUIMICA, S.A., SPAIN

Ilustrační obrázek

Project: Distribution Storage of Liquid and Solid Chemicals
Client: Neuber Brenntag AG,Germany / Brenntag Quimica, S.A., Spain
Location: Sevilla, Dos Hermanas, Spain

Contractors:
Technological part: Sommer Allibert, France, Schwaben Kunststoff GmbH, Germany, Friatec GmbH, Germany
Construction Part: Detea, S.A. Spain

Project Work: 01/2000 - 08/2002
Construction: 03/2001 - 03/2003
Investments: 19/ 6 mil. EUR (Total/ Civil)

Technological Part

Inorganic chemistry- build up the filling and tanking places for 6 road tanks, pump station, storing- capacity 2 100 m3 (70 pcs. of above-surface double skinned tanks, each with nominal volume of 30 m3 ), packages, barrels and containers filling.
Construction contains neutralisation station for contami-nated sewerage water and waste gas treatment unit consisting of 9 waste gas washers.

Organic chemistry (flammable matters) - build up the filling and tanking places for 4 road tanks, pumping station and storing - capacity 1280 m3 (11 underground double skinned stainless steel storage tanks each 100 m3 and 6 above-surface stainless steel storage tanks each 30 m3) package, barrels and containers filling

Civil Part

Storage building for inorganic part 85 x 24 m, height 13 m, carrying reinforced concrete construction, masonry filler, foundation on the piles.

Storage buildings for organic part 50 x 30 m, 8 m height and 20 x 12 m, 8 m height, carrying reinforced concrete construction, masonry filler, foundation on the piles.

The Basic Design, Detail Design and complete engineering services (except the negotiations with local authorities) ware provided for the client.